Highmore Wind Farm – Highmore, SD

TVIG was the BOP general contractor for this 40.5 MW project built for FPL in 2003. Located in central South Dakota, TVIG’s scope of work included the site roads, foundations, the turbine erection, collection system and the substation.

Share by: